Moovit Updates

Boston – Green Line

Due to sidewalk construction, use caution when using the North Station pedestrian access from Causeway St on the west-side Lomasney Way entrance.
The City of Boston will be performing sidewalk reconstruction on Causeway Street and in front of the Tip O’Neill Federal Building from Friday, June 3 through Friday, June 10.

Affected routes:
Green Line B branch
Green Line C branch
Green Line D branch
Green Line E branch
Orange Line

 

Green Line: 

Buses replacing Green Line D branch service. Buses will replace Riverside branch service between Reservoir & Newton Highlands Stations on Monday, June 6, through Thursday, June 9, from approximately 9:00 pm through the end of service.

Regular Green D branch service will resume at the start of service the following day. All shuttle bus stops are accessible for persons with disabilities

Shuttling the following stops:
Reservoir
Chestnut Hill (connect at Boylston St @ Hammond St)
Newton Centre (connect at Union St)
Newton Highlands (connect at Walnut St @ Lincoln St)

*****

Exit mobile version