Moovit Updates

Fast Track This Week – 2

FASTRACK is a subway maintenance, cleaning, and repair program that shuts down segments of a subway line for several hours over consecutive weeknights, allowing our employees to perform a number of critical maintenance jobs. The line shutdown approach has proven successful in that, under normal conditions in our 24/7 system, the scope and breadth of this important work would be impossible to accomplish with customers and trains moving through work areas. Thus far, since FASTRACK began in 2012, the results have had a positive impact on service with a reduction in train delays and a decrease in the number of track fires, while realizing cost efficiencies and a lower accident rate for employees.

FASTRACK tasks typically include:
Track – remove debris and repair or replace tie blocks and running rails.
Third Rail Operations – clean and remove debris from under and around the third rail.
Signals – perform general maintenance on signals and switches and replace dispatcher holding lights.
Infrastructure – repair or replace handrails, signs, and tunnel lighting. Clean track drains and repair water damage/leaks.
Electronic Maintenance – optimize performance of closed-circuit television monitors and cameras. Inspect and test    public address system equipment.
Station Environment – perform high-intensity station cleaning and painting as well as perform elevator and escalator   repair work. Clean vents and drains.

FASTRACK begins weeknights at 10 PM and ends 5 AM the next morning. This service change will run for one week from May 2 to May 6 nightly, ending Friday morning. Read on for more information.

No  trains between Flatbush Av and Franklin Av
Free shuttle buses provide alternate service

 service ends earlier in Brooklyn-Take the  or  instead

 service operates between 241 St and the Utica Av station, the last stop


Travel alternatives:

 

 

Exit mobile version