Back

TTC – Scheduled Subway Closures

    • There will be no subway service on Line 1 between Eglinton and King stations on Saturday, March 13, 2021 for Automatic Train Control signal system installation. Shuttle buses will operate.

     

    • There will be no subway service on Line 1 between Sheppard-Yonge and Bloor-Yonge stations on Sunday, March 14, 2021 for Automatic Train Control signal system installation. Shuttle buses will operate.

     

    • There will be no subway service on Line 1 between St George and St Andrew stations for ten days from Monday, March 15 to Wednesday, March 24, 2021. Regular subway service will resume at approximately 6 a.m. on Thursday, March 25, 2021. Shuttle buses will replace subways during this time. All shuttle buses are accessible and will operate every 60 seconds or better during the morning rush period to provide safe travel and physical distancing.

    For all TTC service advisories, click here.

    You Ride. We Guide.

    Previous