Red Line
- Station Issue ONGOINGThe Braintree and Quincy Adams parking garages are closed through April 19 for accelerated concrete replacement work.
Both stations have surface parking lots available. Riders can continue to use PayByPhone or pay-by-plate with the same parking fees as other MBTA surface lots.
Affected routes:
Red Line - Station Issue ONGOINGThe Hancock Street lot is closed to allow for the construction of the North Quincy Garage. As an alternative, over 300 spaces are available in the Newport Avenue lot. MBTA.com/NorthQuincyAffected routes:
Red Line
Orange Line
- Shuttle ONGOINGShuttle buses replacing Orange Line service between Oak Grove and Sullivan Square through April 11 for ongoing infrastructure upgrades at Wellington and to address damage from the derailment.Customers should plan extra time into their commute. Trains may stand by at stations longer than usual due to single tracking between Sullivan Square and Community College.
After completing track work, we typically implement speed restrictions while we monitor the tracks to ensure that ballast and other materials have settled properly. Restrictions are lifted after we get confirmation from an engineer, which can sometimes take several days.Affected stops:
Oak Grove
Malden Center
Wellington
Assembly
Sullivan Square - Station Issue ONGOINGDue to the ongoing construction at Oak Grove, customers are not able to pass through the station between Washington St and the Banks Pl busway and parking lot.Affected routes:
Orange Line
Green Line B
- Shuttle UPCOMINGShuttle buses replace Green Line B Branch service from April 17 – May 9 & May 17 – June 13 to allow for work on the Station Consolidation Project. More: MBTA.com/GLBwork
Shuttles run all day, every day, including nights and weekends. All shuttle buses are accessible for persons with disabilities.
Affected stops:
Kenmore
Blandford Street
Boston University East
Boston University Central
Boston University West
Saint Paul Street
Babcock Street
Packards Corner
Harvard Avenue
Griggs Street
Allston Street
Warren Street
Washington Street - Shuttle UPCOMINGShuttle buses replace Green Line B Branch service between Kenmore and Babcock St Mon – Thurs through April 15, beginning at 8:45 PM through the end of service. The work for tonight, March 31, has been cancelled. More: MBTA.com/GLBwork
This diversion will allow for work on the B Branch Station Consolidation Project. All shuttle buses are accessible to people with disabilities, if you need assistance, please see station personnel.
Affected stops:
Kenmore
Blandford Street
Boston University East
Boston University Central
Boston University West
Saint Paul Street
Babcock Street - Service Change ONGOINGPleasant Street station permanently closed on Feb 27, as part of the B Branch Station Consolidation project. Passengers can board at either Babcock St or St Paul St while this work is taking place.
Green Line D
- Station ClosureBrookline Hills Station will be closed from the end of service on Fri, April 2 through winter 2021 to allow for work on the Brookline High School expansion project. Riders should use nearby Brookline Village station as an alternative.
An accessible van will run between Brookline Hills and Brookline Village.
Affected routes:
Green Line D branch - Shuttle UPCOMINGShuttle buses replacing Green Line D Branch service between Kenmore and Riverside on weekends through May 2, beginning Friday evenings at 8:45 PM. MBTA.com/GLDwork
Work will begin at 8:45 PM on Friday, and will continue through the end of service Sunday. All shuttle buses are accessible for persons with disabilities.
No Shuttles at Beaconsfield:
Why do shuttles skip Beaconsfield? Due to narrow roads near Beaconsfield, shuttles cannot safely stop there.
We recommend:
– Taking the Green Line C branch from Dean Road, about a 4-minute walk from Beaconsfield
– Accessing the Green Line D shuttle from Reservoir, about a 10-minute walk from BeaconsfieldAffected stops:
Kenmore
Fenway
Longwood
Brookline Village
Brookline Hills
Beaconsfield
Reservoir
Chestnut Hill
Newton Centre
Newton Highlands
Eliot
Waban
Woodland
Riverside - Shuttle UPCOMINGShuttle buses replacing Green Line D Branch service between Kenmore and Reservoir the weekends of May 8 – 9 & 29 – 30, beginning Friday evenings at 8:45 PM. MBTA.com/GLDwork
This is to allow for track work and for construction on the Brookline High School expansion project. Work will begin at 8:45 PM on Friday, and will continue through the end of service Sunday.
Affected stops:
Kenmore
Fenway
Longwood
Brookline Village
Brookline Hills
Beaconsfield
Reservoir - Shuttle UPCOMINGShuttle buses replace D Branch service between Reservoir and Riverside Mon – Thurs from Mar 15 – Apr 15, beginning at 8:45 PM through the end of service. MBTA.com/GLDwork
All shuttle buses are accessible.
Affected stops:
Reservoir
Chestnut Hill
Newton Centre
Newton Highlands
Eliot
Waban
Woodland
Riverside
Green Line E
- Service Change ONGOINGShuttle buses replace Green Line service between North Station and Lechmere until Spring 2021 to allow for work on the Green Line Extension and the Lechmere Viaduct Rehabilitation Project. More: MBTA.com/GLEwork
Please allow for extra travel time. All shuttle buses and stops are accessible.
Affected stops:
Lechmere
Science Park/West End
North Station
Blue Line
- Station Issue ONGOINGSuffolk Downs pedestrian bridge is closed until further notice due to structural issues. Customers can connect to the other platform by exiting at Orient Heights or Beachmont and take a train back to Suffolk Downs.