Crum Creek Viaduct Replacement Project

June 15, 2016

    Shuttle Bus Substitution Between Elwyn and Morton Stations

    Due to construction on the Crum Creek Viaduct, shuttle bus service will replace ALL trains at Elwyn, Media, Moylan-Rose Valley, Wallingford, AND Swarthmore Stations Saturday, June 18 and Sunday, June 19

    Busing in place of trains will continue Monday, June 20 between Elwyn and Swarthmore Stations. Please look for separate signage for service information or visit the Crum Creek Replacement Project alerts page.

    Customers should read the information and check the timetables below as shuttle bus times are different from train times:

    Transfer to Trains/Buses at Morton Station

    Customers should expect approximately 20 minutes of additional travel time

    Schedule Information:

    There are two ways to view the special Saturday, June 18 and Sunday, June 19 schedules:

    PDF | Download the PDF timetable

    Inbound (towards Center) Service

    Shuttle buses will depart 28 minutes EARLIER than regularly scheduled trains. Trains will depart Morton Station at the regularly scheduled time.

    Special Media/Elwyn Inbound (towards Center City) Schedule for Saturday, June 18 and Sunday, June 19, 2016

    Outbound (towards Elwyn) Service:

    Trains will depart Center City Stations at the regularly scheduled times. Shuttle buses will depart Morton Station 5 minutes LATER than regularly scheduled trains and will arrive at Elwyn Station 28 minutes LATER.

    Special Media/Elwyn Outbound (towards Elwyn) Schedule for Saturday, June 18 and Sunday, June 19, 2016

    Customer Tips & Additional Information:

    Shuttle bus boarding locations are noted in the timetable above. Please look for directional signage posted at stations for additional boarding information.

    Printed versions of the schedules will be posted at stations.

    Customers should look for separate signage posted at stations schedule information during the June 20 through September 4, 2016 Crum Creek Viaduct Replacement Project.

    Additional advisories on the Media/Elwyn Line are noted below.

    Crum Creek Viaduct Replacement Project | Shuttle Bus Substitution between Elwyn and Swarthmore Stations

    Beginning Monday, June 20 and Continuing through Sunday, September 4, 2016

    As part of the Rebuilding the System Program, SEPTA and third-party forces will work to complete a critical phase of construction on the new Crum Creek Viaduct in which new track will be installed along with the installation of new girders, deck, and catenary towers.

    Impact to Service

    Shuttle buses will replace ALL trains at Elwyn, Media, Moylan-Rose Valley, and Wallingford Stations Weekdays, and Saturday & Sunday. Customers should transfer from bus to train at Swarthmore station for service to Center City.

    Visit the Crum Creek Replacement Project service page for schedules, parking, and bus boarding information.

    Temporary Weekday Boarding Location Change

    Continuing Through June 2016 | 9:05 a.m. – 2:30 p.m.

    Due to overhead wire work, all Trains will board from the Outbound (towards Elwyn) platform beginning with Train #9346 (departing Elwyn Station at 8:55 a.m.) at the following stations:

    SecaneLansdowne
    PrimosFernwood
    CliftonAngora
    Gladstone49th Street

    Please check System Status regularly or listen for station announcements for any additional boarding information

    *****

    Previous